# Asset, Risks, and Controls Governance

# 🛡 **Governance**
> **"Connect risks, assets, and controls — and track how your architecture actually looks."**
> *Brainframe GRC helps you keep track of  how your assets, risks, and controls interact with each other to give you a helicopter view of your system.*

## 1️⃣ Governance Document Types

Every governance document is assigned one of three types, which determines its role in your framework:

| Type | Purpose |
| ---- |
| **Risk** | Represents the impact and probability of a threat materialising |
| **Asset** | Represents a system, process, or resource that needs to be protected |
| **Control** | Defines a measure put in place to reduce or manage a risk |

The **Governance Tab** adapts its layout depending on which type the document is, showing the relevant information and options for that context.

| 📌 Linked documents are bi-directional — a link created from a Risk document will also appear on the linked Asset or Control document.

---

## 2️⃣ Linked Entities by Document Type

### 🔴 Risk Documents

Risk documents display the following linked sections:

* **Linked Controls** — Controls that have been put in place to address this risk.
* **Linked Assets** — Assets that are exposed to or affected by this risk.

This gives you a complete picture of both *what is being done* about a risk and *what is at stake* if it materialises.

![](https://storage.crisp.chat/users/helpdesk/website/-/3/f/2/6/3f26ce462760bc00/screenshot-2026-06-16-at-17345_7fkqis.png =917xauto)


---

### 🔵 Asset Documents

Asset documents display the following linked sections:

* **Linked Risks** — Risks that apply to or threaten this asset.
* **Linked Controls** — Controls in place that protect this asset.
* **Max Potential Impact / Consequences** — The maximum business impact if this asset is compromised (unchanged existing section).

This allows asset owners to understand both their exposure and their coverage in a single view.

![](https://storage.crisp.chat/users/helpdesk/website/-/3/f/2/6/3f26ce462760bc00/screenshot-2026-06-16-at-17354_1s27kvr.png =982xauto)
![](https://storage.crisp.chat/users/helpdesk/website/-/3/f/2/6/3f26ce462760bc00/screenshot-2026-06-16-at-17355_1uiohll.png =981x151)](https://storage.crisp.chat/users/helpdesk/website/-/3/f/2/6/3f26ce462760bc00/screenshot-2026-06-16-at-17355_1aeu9gx.png =981x220)



---

### 🟢 Control Documents

Control documents display the following linked sections:

* **Linked Risks** — The risks that this control is designed to mitigate.
* **Linked Assets** — The assets that benefit from this control.
* **Risk Reduction** — The estimated reduction in risk provided by this control (unchanged existing section).

This gives control owners full visibility into what their control is protecting and why it exists.

![](https://storage.crisp.chat/users/helpdesk/website/-/3/f/2/6/3f26ce462760bc00/screenshot-2026-06-16-at-17423_lm4g4f.png =911xauto)
![](https://storage.crisp.chat/users/helpdesk/website/-/3/f/2/6/3f26ce462760bc00/screenshot-2026-06-16-at-17425_zttofq.png =918xauto)


---

## 3️⃣ Mitigation Implementation Status

For every linked Control relationship — whether viewed from the Control document itself, a linked Risk document, or a linked Asset document — you can configure and track the **mitigation implementation status**.

This answers the critical question: *"Has this control actually been put into practice?"*

### Available Statuses

| Status | Meaning |
| ---- |
| **Not configured** | Implementation status has not yet been assessed |
| **Not implemented** | The control exists but has not been applied |
| **Partially implemented** | The control is in place for some scope or cases only |
| **Implemented** | The control is fully applied and operational |

### Setting the Status

The implementation status is set via a **dropdown**, accessible directly within the linked control entry on any associated document.

1. Open any governance document (Risk, Asset, or Control).
2. Locate the relevant linked control in the **Linked Controls** section (or the control's own governance tab).
3. Click the **implementation status dropdown** next to the linked entry.
4. Select the appropriate status.


| 📌 The status is stored once and displayed consistently across all linked documents. Updating it from one document automatically reflects the change everywhere that control relationship appears.

---

## 4️⃣ Synchronisation Across Linked Documents

A core design principle of the Governance Tab is that **mitigation implementation state is always consistent**, regardless of which document you view it from.

For example:

* A **Risk** document linked to *Control A* shows *Control A*'s implementation status as **Partially implemented**.
* Opening the **Control A** document itself — or any other **Asset** linked to *Control A* — will show the same **Partially implemented** status.
* Updating the status from any of those documents instantly updates it everywhere.

There is a **single shared source of truth** for each linked control relationship — no duplication, no drift.

---

## 5️⃣ Best Practices

* 🔗 **Always link controls back to risks and assets** so your framework remains traceable end-to-end.
* 📋 **Set implementation statuses early** — even marking something as *Not implemented* is valuable for gap analysis and audit readiness.
* 🔄 **Review statuses regularly** as controls are deployed, updated, or retired.
* 🧮 **Use Control documents as your single point of truth** for implementation status — the sync ensures all linked documents stay up to date automatically.
* 📂 **Keep your governance document types accurate** — the linked sections displayed in the Governance Tab depend on the type assigned to each document.

---

## 🎯 Visual Checklist

* [x] Governance documents assigned correct types (Risk / Asset / Control)
* [x] Risks linked to relevant Assets and Controls
* [x] Assets linked to relevant Risks and Controls
* [x] Controls linked to relevant Risks and Assets
* [ ] Mitigation implementation status set for all linked controls
* [ ] Implementation statuses reviewed and up to date
* [ ] Governance tab reviewed by document owners ahead of next audit